The chilled water plant includes:
• Installing the chiller, air separator, expansion tank and the pumps
• Supply and install interconnecting chilled water pipes network
• Insulating and cladding the chilled water network
• Supply and install pipes network valves
• Supply and install MCC with cables tray and cables.

Scope of Work:
PROJECT DETAILS
| Client: | |
| Consultant: | El Hewady Consultant |
| Location: | 10 Of Ramadan, Egypt. |
| Date: | Feb 2014 |
| Type Of Project: | Industrial |