The chilled water plant includes:
• Installing the chiller and the pumps.
• Supply and install interconnecting chilled water pipes network.
• Insulating and cladding the chilled water network.
• Supply and install pipes network valves.

Scope of Work:
PROJECT DETAILS
| Client: | |
| Consultant: | El Hewady Consultant |
| Location: | El Sawah, Cairo, Egypt |
| Date: | June 2013 |
| Type Of Project: | Industrial |