The chilled water plant includes
• Installing the chiller, cooling tower and the pumps.
• Supply and install interconnecting chilled water pipes network.
• Insulating and cladding the chilled water network.
• Supply and install pipes network valves.
• Supply and install MCC with cables tray and cables.

Scope of Work:
PROJECT DETAILS
| Client: | |
| Location: | 6 October, Cairo, Egypt. |
| Date: | Dec 2012 |
| Type Of Project: | Industrial |