• Supply and Install HVAC and Control System, DX package units and ventilation fans.
• Supply and Install duct work, insulation, MCC and BMS system.
• Testing and balancing for the system.

Scope of Work:
PROJECT DETAILS
| Client: | |
| Consultant: | Integrated Consulting Group |
| Location: | 6 October, Cairo, Egypt. |
| Date: | Feb 2013 |
| Type Of Project: | Industrial |