Chilled water network includes:
• Supply and install pre-insulated pipes 600 meter long
• Evacuation and cleaning the ground for laying the pipes
• Supply and Install polyurethane foam for the pipes
• Backfilling over the pre pipes.
• Flushing and testing the network

Scope of Work:
PROJECT DETAILS
| Client: | |
| Consultant: | Shaker Consultancy Group |
| Location: | Cairo/ El sawah |
| Date: | june. 2017 |
| Type Of Project: | Industrial |