Scope of Work:

Chilled water network includes:
• Supply and install pre-insulated pipes 600 meter long
• Evacuation and cleaning the ground for laying the pipes
• Supply and Install polyurethane foam for the pipes
• Backfilling over the pre pipes.
• Flushing and testing the network

PROJECT DETAILS

Client:
Consultant: Shaker Consultancy Group
Location: Cairo/ El sawah
Date: june. 2017
Type Of Project: Industrial