2b-1-1170x654

Scope of Work:

The steam plant includes:
• Installing the boiler including the burner.
• Supplying and installing boiler chimney.
• Supplying and installing the interconnecting pipes and the steam header.
• Supplying and installing the boiler feed water pumps.
• Supplying and installing boiler diesel tank and fuel pumps.

PROJECT DETAILS

Client:
Consultant: CATEC
Location: El Sawah, Cairo, Egypt
Date: Sep 2013