The chilled water plant includes
• Installing the chiller, cooling tower and the pumps.
• Supply and install interconnecting chilled water pipes network.
• Insulating and cladding the chilled water network.
• Supply and install pipes network valves.
• Supply and install MCC with cables tray and cables.

Scope of Work:
PROJECT DETAILS
Client: | |
Location: | 6 October, Cairo, Egypt. |
Date: | Dec 2012 |
Type Of Project: | Industrial |