7-Kraft-xx

Scope of Work:

The chilled water plant includes:
• Installing the chiller, air separator, expansion tank and the pumps
• Supply and install interconnecting chilled water pipes network
• Insulating and cladding the chilled water network
• Supply and install pipes network valves
• Supply and install MCC with cables tray and cables.

PROJECT DETAILS

Client:
Consultant: El Hewady Consultant
Location: 10 Of Ramadan, Egypt.
Date: Feb 2014
Type Of Project: Industrial